This document will walk you through brackets used on an existing bridge structure and a soldier pile wall with timber lagging. The example on the bridge presents an existing overhang that’s demolished and a new wider overhang is poured back. The example on the soldier pile wall will present the brackets supported by the timber lagging, while supporting a new cap structure.
This will show where the loads come from, the stresses on the different members of the falsework system, and checking the members against allowable stresses.
All sales are final, no refunds.